Hangzhou power tunnel project
This power tunnel project consists of 4,451 meters of pipe jacking, 184 meters of open-cut tunneling, and 12 power working shafts, comprising a total of 11 sections. The system includes inspection robot systems, environmental and equipment monitoring systems, fiber-optic telephone systems, wireless communication systems, automatic fire alarm systems, fire door monitoring systems, and mobile signal systems, achieving comprehensive tunnel monitoring. Through the integrated application of these advanced systems, the level of tunnel safety management has been enhanced while ensuring stable and reliable power supply, laying a solid foundation for urban sustainable development.