Intelligent integrated power supply system for the State Grid Xinjiang Bachu-Kashgar 750kV power transmission and transformation project
The Kuqa-Aksu-Bachu-Kashgar 750kV power transmission and transformation project, officially commenced in September 2014, involved the construction of three new 750kV substations in Aksu, Bachu, and Kashgar. The project utilized the intelligent integrated power supply system provided by our company and was put into operation in 2015. This project is part of the backbone grid for realizing Xinjiang's 750kV power grid with "three ring networks, dual channels, and two extensions" during the 12th Five-Year Plan period, and it is a key project in Xinjiang for 2015.